James Street West, Bath
Contractor
Rydon Construction
Scope of Work.
Construction of New Student Accommodation.
Scaffolding Supplied.
Designed External Scaffolding, Loading and Stair Towers to the perimeter of a new Three Storey building.
The main elevation of the building built totally free standing, with cantilevers scaffolding built at high level, to provide access to sloping roof surfaces. Kentledge and beam work was used to stabilise the scaffolding, built free standing to a height off 14m.