Bristol Airport
Contractor
Goldbeck Construction
Scope of Work
Scaffolding to the perimeter of multi story cast insitu concrete pedestrian service blocks to enable the installation of External Cladding and finishes.
The scaffolding to the main service block, spanned across airport pedestrian access and had to be fully designed to ensure that the building works could progress and that the public were protected during the construction works.
Scaffolding work supplied included: –
Full perimeter access scaffolding, incorporating totally free standing scaffolding and bridges.
Proprietary Stair and Loading Towers
Internal Birdcages.