The National Museum of Wales
Contractor
Morgan Sindall
Scope of Work.
The refurbishment of a listed building. As a design challenge, it was not possible to physically or mechanically tie the scaffolding structure to the building. Consequently, the scaffolding was designed to be free standing.
Scaffolding work supplied included: –
- Haki 750 Temporary Roof
- Full perimeter access scaffolding
- Designed bridges
- Stair Towers
- Internal Birdcages.