The National Museum of Wales

Contractor

Morgan Sindall

Scope of Work.

The refurbishment of a listed building.  As a design challenge, it was not possible to physically or mechanically tie the scaffolding structure to the building.  Consequently, the scaffolding was designed to be free standing. 

Scaffolding work supplied included: –

  • Haki 750 Temporary Roof
  • Full perimeter access scaffolding
  • Designed bridges
  • Stair Towers
  • Internal Birdcages.