Queens Arcade, Cardiff
Contractor
Morgan Sindall
Scope of Work.
The internal Refurbishment of a Shopping Arcade in Central Cardiff. The scaffolding was erected out of working hours, to allow the uninterrupted use of the Arcade for commerce always.
Scaffolding work supplied included: –
- Designed scaffolding structure built with fully boarded 2m lifts.
- Built off bridge beams to allow complete uninterrupted access beneath.
- The scaffolding structure built off and hanging down from the bridge structure.