Queens Arcade, Cardiff

Contractor

Morgan Sindall

Scope of Work.

The internal Refurbishment of a Shopping Arcade in Central Cardiff.  The scaffolding was erected out of working hours, to allow the uninterrupted use of the Arcade for commerce always. 

Scaffolding work supplied included: –

  • Designed scaffolding structure built with fully boarded 2m lifts.
  • Built off bridge beams to allow complete uninterrupted access beneath. 
  • The scaffolding structure built off and hanging down from the bridge structure.