Beacon Tower, Fishponds, Bristol

Contractor 

Farrans Construction Limited 

Scope of Work 

Replacement of external Cladding to multi storey high rise residential block. 

Scaffolding work supplied included: – 

  • An External Perimeter Access Scaffolding, fully boarded at 2m lifts 
  • Provision of 1330 HD Beams to form bridges, supporting external scaffolding over parking and adjacent building 
  • Dead Shoring to the underside of low-level roofs to transfer load of external scaffolding to the foundation. 
  • Stair Tower  
  • Ladder Towers  
  • Temporary cover above eaves  
  • 1500kg Passenger and Goods Hoist 
  • High level Cantilever Loading Platforms