Taunton Leisure Center
ContractorÂ
Kier.Â
Scope of WorkÂ
The refurbishment of a Leisure centre in the town centre. Â Â
Scaffolding work supplied included: –Â
- Deigned bridged Birdcage over the swimming pool
- Stair Towers
- Edge ProtectionÂ
- General access scaffolding
- Full design and provision of Statutory Scaffolding Inspections. Â
