Gwyn Hall, Neath
Contractor
Morgan Sindall
Scope of Work.
The external and internal Refurbishment of a Grade 2 listed building in the centre of the town. Work included a multi storey extension to the building at the rear.
The access scaffolding was constructed to minimise ties into the building.
Scaffolding work supplied included: –
- Access scaffolding to the perimeter of the building fully boarded at 2m lifts
- Stair Towers
- Bridges over low level roofs
- Gantry
- Fully designed structure.
- Internal birdcages to access floors and the roof including beams to create clear floor space.