Gwyn Hall, Neath

Contractor

Morgan Sindall

Scope of Work.

The external and internal Refurbishment of a Grade 2 listed building in the centre of the town.  Work included a multi storey extension to the building at the rear.

The access scaffolding was constructed to minimise ties into the building.

Scaffolding work supplied included: –

  • Access scaffolding to the perimeter of the building fully boarded at 2m lifts
  • Stair Towers
  • Bridges over low level roofs
  • Gantry
  • Fully designed structure.
  • Internal birdcages to access floors and the roof including beams to create clear floor space.