Llanelli Library
Contractor
Kier, Western and Wales.
Scope of Work.
The external and internal Refurbishment of a Grade 2 listed library in the centre of the town. Â
The access scaffolding was constructed to be fully independent from the building, loads transferred from the external scaffolding into the internal birdcage.
Scaffolding work supplied included: –
- Access scaffolding to the perimeter of the building, fully boarded in 2m lifts
- Stair Towers
- Internal Birdcages to the floors and the roof.
- Support to the roof structure.
- Provision of a Haki 750 roof system
- Sheeted and netted with fire retardant materials.
- Fully designed structure.
