Travel Lodge, Chippenham
Contractor
WRW Construction
Scope of Work
Construction of a new Travel Lodge Hotel. A steel frame, cast insitu floors and external cladding and masonry.
Scaffolding work supplied included: –
- Access scaffolding to the perimeter of the building fully boarded at 2m lifts
- Stair and Loading Towers
- Bridges
- Edge Protection to multiple arrangements
- Full designed and Statutory scaffolding inspections.
- Internal birdcages
- Lift and Service shafts.